Civil Engineering MCQs

Page No. 97

The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?


a 1.5 m 3


b2.5 m3


c3.5 m3


d 5.0 m3


View Answer 5.0 m3

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?


a 1.80 litres for 5 to 10 users


b1.20 litres for 15 users


c1.35 for 20 users


d All the above


View Answer All the above

The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?


aExcavation


bSurface dressing


cCutting


d Surface excavation


View Answer Surface excavation

The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?


ab – rd)²/(r – s)


b b – rd)²/(r + s)


c½ × (b + rd)²/(r – s)


d b – rd)²/(s – r)


View Answer b – rd)²/(r – s)

For the construction of buildings, the subheads of the estimate are________________?


a Earthwork, Concrete work, Brick work


bBrickwork, Stone work, Roofing


c Brickwork Flooring, Wood work, Steel work


dAll the above


View Answer All the above

Cost of fittings and their fixing is specified for the following sanitary fittings________________?


aWater closets


bFlushing pipes


cLavatory basins


d All the above


View Answer All the above

The measurement is made in square metre in case of_________________?


aCement concrete in foundation


b R.C.C. structure


cHollow concrete block wall


dNone of these


View Answer None of these

The area of the cross-section of a road fully in banking shown in the given figure, is________________?


a [sb² + r² (2bd + sd)²]/(r² – s²)


b [sb² + r² (2bd + sd)²]/(r² – s5)


c [sb² + r² (2bd + sd)²]/(r – s)


dNone of these



The following item of earth work is not measured separately ?


aSetting out of works


b Site clearance


c Steps in deep excavation


dAll the above


View Answer All the above

Pick up the correct statement regarding the centre line method of estimating a building?


a Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item


bThe centre line is worked out separately for different sections of walls of a building


cThe centre line length is reduced by half the layer of main wall joining the partition wall


d All the above


View Answer All the above

Goto Page No.

Page 97 of 302

Alphabetical MCQs Categories

Here below You find all kind of categories of MCQs in alphabetical order.


"Comprehensive Collection of MCQs: Alphabetically Organized by Subject"

"Discover an extensive collection of multiple-choice questions (MCQs) neatly categorized by subject from A to Z. This resource is designed for anyone eager to explore various topics in a straightforward and organized manner. Whether you're a student preparing for exams, an educator seeking supplementary materials, or simply curious about different subjects, this compilation offers a convenient way to learn and assess your knowledge. With questions arranged alphabetically, navigation is effortless, allowing you to delve into subjects of interest at your own pace. Engage, learn, and expand your understanding with this accessible and comprehensive repository of MCQs!"


BolPakistan

bolpakistan.com.pk includes Job Mcqs and Pak Mcqs is the Top Largest Mcqs Forum in World, in which you can read Mcqs of All Subjects, PPSC test preparation, FPSC, NTS and PPSC PAST PAPERS, PPSC PAST MCQS. A Collection of Repeated MCQs for JOBs seekers.

Copyright © 2024, Designed & Developed by BolPakistan