While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?


aAt the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar


bIn thin slabs, 12 mm minimum or diameter of the bar whichever is more


c For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more


dAll the above


View Answer All the above

The plinth area of a building not includes_________________?


aArea of the walls at the floor level


bInternal shaft for sanitary installations up to 2 sq m. in area


c Lift and wall including landing


dArea of cantilevered porch



The main factor to be considered while preparing a detailed estimate, is________________?


aQuantity of the materials


bAvailability of materials


c Transportation of materials


dAll the above


View Answer All the above

The rate of an item of work depends on_________________?


aSpecifications of works


bSpecifications of materials


c Proportion of mortar


dAll the above


View Answer All the above

As per IS : 1172-1963, water required per head per day for average domestic purposes, is_______________?


a50 litres


b65 litres


c105 litres


d135 litres


View Answer 135 litres

If four fires break out in a city of population 40 lakhs and if each hydrant has three streams and duration of each fire is four hours, the total quantity of water required, is______________________?


a 1880 kilo litres


b 2880 kilo litres


c 3880 kilo litres


d 4880 kilo litres


View Answer 2880 kilo litres

Aeration of water is done to remove______________?


aodour


bcolour


cbacterias


dturbidity


View Answer odour

Disinfection of drinking water, is done to remove_________________?


aodour


bbacterias


cturbidity


dcolour


View Answer bacterias

The expected discharge to be obtained from an open well sunk in coarse sand is 0.0059 cumec. If the working depression head of the well is 3 m, the minimum diameter of the well, is________________?


a 2 m


b2.25 m


c 2.75 m


d3.00 m


View Answer 3.00 m

Time of concentration________________?


ais the time taken, for precipitation


bduration of rainfall.


ctime taken for all the ran off to reach the drain


d time taken for the storm water to travel from the most remote point to the drain



Goto Page No.

Page 99 of 302

Alphabetical MCQs Categories

Here below You find all kind of categories of MCQs in alphabetical order.


"Comprehensive Collection of MCQs: Alphabetically Organized by Subject"

"Discover an extensive collection of multiple-choice questions (MCQs) neatly categorized by subject from A to Z. This resource is designed for anyone eager to explore various topics in a straightforward and organized manner. Whether you're a student preparing for exams, an educator seeking supplementary materials, or simply curious about different subjects, this compilation offers a convenient way to learn and assess your knowledge. With questions arranged alphabetically, navigation is effortless, allowing you to delve into subjects of interest at your own pace. Engage, learn, and expand your understanding with this accessible and comprehensive repository of MCQs!"


BolPakistan

bolpakistan.com.pk includes Job Mcqs and Pak Mcqs is the Top Largest Mcqs Forum in World, in which you can read Mcqs of All Subjects, PPSC test preparation, FPSC, NTS and PPSC PAST PAPERS, PPSC PAST MCQS. A Collection of Repeated MCQs for JOBs seekers.

Copyright © 2024, Designed & Developed by BolPakistan