In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?


acomplete details’of items in, waiting line are known

✖


barrival and waiting times are known and can be grouped to form a waiting line model

✖


call variables and constants are known and form a linear equation

✖


dthe laws governing arrivals, service times, and the order in which the arriving units are taken into source are known

✓



The reasons which are basically responsible for the formation of a queue should be that ___________________?


athe average service rate Hess than the average arrival rate

✖


boutput rate is linearly proportional to input

✖


coutput rate is constant and the input varies in a random manner

✖


dall of the above

✓


View Answer all of the above

In perpetual inventory control, the material is checked as it reaches its__________________?


aminimum value

✓


bmaximum value

✖


caverage value

✖


dmiddle value

✖


View Answer minimum value

Bar charts are suitable for_____________________?


aminor works

✓


bmajor works

✖


clarge projects

✖


dall of the above

✖


View Answer minor works

Pick up the correct step used for scheduling a project by C.P.M.__________________?


aa project is divided into various activities

✖


brequired time for each activity is established

✖


csequence of various activities is made according to their importance

✖


dall of the above

✓


View Answer all of the above

The disadvantage of product layout is_________________?


ahigh initial investment for the specialized facilities

✓


bskilled labour to operate machines

✖


cproduction time is longer, requiring more goods in inventory

✖


dhigh cost of inspection

✖



Routing assists engineers in deciding in advance___________________?


athe flow of material in the plant

✖


bthe methods of proper utilization of manpower

✖


cthe methods of proper utilization of machines

✓


dthe layout of factory facilities

✖



A dummy activity________________?


ais artificially introduced

✖


bis represented by a dotted line

✖


cdoes not require any time

✖


dall of the above

✓


View Answer all of the above

The difference between the time available to do the job and the time required to do the job, is known as_________________?


aevent

✖


bfloat

✓


cduration

✖


dconstraint

✖


View Answer float

The critical activity has____________________?


amaximum float

✖


bminimum float

✖


czero float,

✓


daverage float

✖


View Answer zero float,

Goto Page No.

Page 60 of 190

Alphabetical MCQs Categories
—

Here below You find all kind of categories of MCQs in alphabetical order.


"Comprehensive Collection of MCQs: Alphabetically Organized by Subject"
—

"Discover an extensive collection of multiple-choice questions (MCQs) neatly categorized by subject from A to Z. This resource is designed for anyone eager to explore various topics in a straightforward and organized manner. Whether you're a student preparing for exams, an educator seeking supplementary materials, or simply curious about different subjects, this compilation offers a convenient way to learn and assess your knowledge. With questions arranged alphabetically, navigation is effortless, allowing you to delve into subjects of interest at your own pace. Engage, learn, and expand your understanding with this accessible and comprehensive repository of MCQs!"


BolPakistan

bolpakistan.com.pk includes Job Mcqs and Pak Mcqs is the Top Largest Mcqs Forum in World, in which you can read Mcqs of All Subjects, PPSC test preparation, FPSC, NTS and PPSC PAST PAPERS, PPSC PAST MCQS. A Collection of Repeated MCQs for JOBs seekers.

Copyright © 2024, Designed & Developed by BolPakistan