The thickness of bituminous carpet varies from__________________?


a20 to 25 mm

✓


b50 to 75 mm

✖


c75 to 100 mm

✖


d100 to 120 mm

✖


View Answer 20 to 25 mm

The suitable surfacing material for a bridge deck slab is________________?


asheet asphalt

✖


bbituminous carpet

✖


c mastic asphalt

✓


drolled asphalt

✖


View Answer mastic asphalt

Which of the following premix methods is used for base course ?


abituminous carpet

✖


bmastic asphalt

✖


csheet asphalt

✖


dbituminous bound macadam

✓



In the penetration macadam construction, the bitumen is__________________?


asprayed after the aggregates are spread and compacted

✓


bpremixed with aggregates and then spread

✖


csprayed before the aggregates are spread and compacted

✖


dnone of the above

✖



In highway construction, rolling starts from________________?


asides and proceed to centre

✓


bcentre and proceed to sides

✖


cone side and proceed to other side

✖


dany of the above

✖



The camber of shoulders in water bound macadam roads is________________?


aequal to the cross slope of pavement

✓


b less than the cross slope of pavement

✖


cgreater than the cross slope of pavement

✖


dzero

✖



Most suitable material for highway embankments is______________?


agranular soil

✓


borganic soil

✖


csilts

✖


dclays

✖


View Answer granular soil

The most suitable equipment for compacting clayey soils is a_______________?


asmooth wheeled roller

✖


bpneumatic tyred roller

✖


csheep foot roller

✓


dvibrator

✖


View Answer sheep foot roller

When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?


aseal coat

✖


b tack coat

✓


cprime coat

✖


dspray of emulsion

✖


View Answer tack coat

For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?


adry rolling, wet rolling, application of screening and application of filler

✖


bdry rolling, application of filler, wet rolling and application of screening

✖


c dry rolling, application of screening, wet rolling and application of filler

✓


ddry rolling, application of screening, application of filler and wet rolling

✖



Goto Page No.

Page 275 of 302

Alphabetical MCQs Categories
—

Here below You find all kind of categories of MCQs in alphabetical order.


"Comprehensive Collection of MCQs: Alphabetically Organized by Subject"
—

"Discover an extensive collection of multiple-choice questions (MCQs) neatly categorized by subject from A to Z. This resource is designed for anyone eager to explore various topics in a straightforward and organized manner. Whether you're a student preparing for exams, an educator seeking supplementary materials, or simply curious about different subjects, this compilation offers a convenient way to learn and assess your knowledge. With questions arranged alphabetically, navigation is effortless, allowing you to delve into subjects of interest at your own pace. Engage, learn, and expand your understanding with this accessible and comprehensive repository of MCQs!"


BolPakistan

bolpakistan.com.pk includes Job Mcqs and Pak Mcqs is the Top Largest Mcqs Forum in World, in which you can read Mcqs of All Subjects, PPSC test preparation, FPSC, NTS and PPSC PAST PAPERS, PPSC PAST MCQS. A Collection of Repeated MCQs for JOBs seekers.

Copyright © 2024, Designed & Developed by BolPakistan