Which of the following methods of offsets involves less measurement on the ground?


amethod of perpendicular offsets

✓


bmethod of oblique offsets

✖


cmethod of ties

✖


d all involve equal measurement on the ground

✖



The correction for sag is_________________?


aalways additive

✖


balways subtractive

✓


calways zero

✖


dsometimes additive and sometimes subtractive

✖


View Answer always subtractive

The camber for hill roads in case of bituminous surfacing is adopted as________________?


a2%

✖


b2.5%

✓


c3%

✖


d4%

✖


View Answer 2.5%

In highway construction on super elevated curves, the rolling shall proceed from_________________?


a sides towards the centre

✖


bcentre towards the sides

✖


clower edge towards the upper edge

✓


dupper edge towards the lower edge

✖



The minimum design speed for hairpin bends in hill roads is taken as_______________?


a20 kmph

✓


b 30 kmph

✖


c40 kmph

✖


d50 kmph

✖


View Answer 20 kmph

In hill roads the side drains arc provided________________?


aonly on the hill side of road

✓


b only on the opposite side of hill

✖


con both sides of road

✖


dnone of the above

✖



The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as_______________?


asloping drain

✖


bcatchwater drain

✓


cside drain

✖


dcross drain

✖


View Answer catchwater drain

Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ?


amastic asphalt

✖


b sheet asphalt

✓


cbituminous carpet

✖


d bituminous concrete

✖


View Answer sheet asphalt

Which of the following is considered to be the highest quality construction in the group of black top pavements ?


amastic asphalt

✖


bsheet asphalt

✖


c bituminous carpet

✖


dbituminous concrete

✓


View Answer bituminous concrete

Select the correct statement________________?


aQuantity of binder required for tack coat is less than that required for prime coat

✖


b Prime coat treatment is given for plugging the voids in water bound macadam during bituminous road construction

✖


cSeal coat is the final coat over certain previous bituminous pavements

✖


d A bitumen primer is a high viscosity cutback

✓



Goto Page No.

Page 274 of 302

Alphabetical MCQs Categories
—

Here below You find all kind of categories of MCQs in alphabetical order.


"Comprehensive Collection of MCQs: Alphabetically Organized by Subject"
—

"Discover an extensive collection of multiple-choice questions (MCQs) neatly categorized by subject from A to Z. This resource is designed for anyone eager to explore various topics in a straightforward and organized manner. Whether you're a student preparing for exams, an educator seeking supplementary materials, or simply curious about different subjects, this compilation offers a convenient way to learn and assess your knowledge. With questions arranged alphabetically, navigation is effortless, allowing you to delve into subjects of interest at your own pace. Engage, learn, and expand your understanding with this accessible and comprehensive repository of MCQs!"


BolPakistan

bolpakistan.com.pk includes Job Mcqs and Pak Mcqs is the Top Largest Mcqs Forum in World, in which you can read Mcqs of All Subjects, PPSC test preparation, FPSC, NTS and PPSC PAST PAPERS, PPSC PAST MCQS. A Collection of Repeated MCQs for JOBs seekers.

Copyright © 2024, Designed & Developed by BolPakistan